Click for more images
Before - old rotten softwood bed edges.
Weed membrane lined gravel paths.
Retained existing strawberry bed.
Completed - now awaiting mushroom compost.
Click for more info/images
Before - Weed/Gravel Area.
Fabric and Sleeper Bed Construction.
Gravel Path and Fill Beds.
Finished - Planting out.
Click for more info
Before - Overgrown Scrub.
During - Filling Raised Oak Beds.
During - Weed membrane, prior to gravel on the terrace.
Finished - Compost and Plants added.
Click for more info/images - pictures taken 8 months after completion.
Differing Angles. Picture taken 8 months after completion - note silvering of Oak.
Differing Lengths. Timbers were cut on site to fit existing bed lengths/widths.
8 months old - Oak will start to turn a silvery grey colour (rather than green with treated softwood).
Green Oak sleepers will outlast treated softwood, and are lined with plastic to protect from soil.